• 1
  • 2
  • 3
  • 4
  • 5

Actuality

  • Recent news
  • Cultural events
  • Sports events

INTERNATIONAL NURSES DAY

By: Official of Institutional Communication of the People's Power Cacocum.Cacocum - When May arrives there are several activities and dates that our country commemorates. This May 12 we were filled...

Read more...

PEASANTRY OF CACOCUMENSE CELEBRATES ITS …

By: Official of Institutional Communication of the People's Power Cacocum.Cacocum - May arrives and with it the rains that together with man make the earth produce and change from brown...

Read more...

YOUNG GRADUATES WITH GOLD DEGREES OR STU…

Por: Funcionario de Comunicación Institucional del Poder Popular. Cacocum - Young graduates with gold degrees or with student positions from different sectors such as Health, Sports, Education and Economy, held an...

Read more...

CACOCUM BACK TO NORMALITY

Cacocum - Council of Municipal Defense in the territory dismantles actions taken before the passage of the Tropical Storm Elsa, when entering the province of Holguin to the Normality Phase.

Read more...

COVID-19: IMMINENT NEGLECT; LATENT CONTA…

Cacocum - The month of June becomes for the municipality of Cacocum the most complex stage since the beginning of the Covid-19 pandemic.

Read more...

NEW PAYMENT SERVICE IMPLEMENTED IN CACOC…

Cacocum - As part of the policy of informatization of the society that is carried out in our country, new platforms are put into operation to streamline processes and economic...

Read more...

DEMAND FROM THE SKY AGAINST THE BLOCKADE…

Cacocum - Pioneers and students staged a kite festival against the blockade in the territory, thus joining the campaign of repudiation against this genocidal policy of the government of the...

Read more...

A DIFFERENT MAY 1ST

Cacocum - We are already for two years absent from the square, absent from the usual parades full of flags, slogans and smiles in honor of the day of the...

Read more...

MAY 1ST FROM EDUCATION

Cacocum - With the creativity of teachers and pioneers, an act for the first of May was carried out in the sector of Education at the Elementary School Gerardo Pérez...

Read more...
April 2026
S M T W T F S
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
April 2026
S M T W T F S
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
Pin It

To make a request for electric power supply the customer must be submitted to the Commercial Office of the relevant locality no less than ten (10) calendar days prior to the need for service. Within this term, it is verified whether or not it complies with the technical conditions for the execution of the service.

The client must provide the following information:

1. Name and Surname of the applicant.

2. Identity card number.

3. Address of the property in question detailing:

  1. Street and Number, if it does not have a number, detail if the sidewalk is even or odd numbered.
  2. Name of the streets.
  3. Ground floor or top floor, passageway and apartment number or letter, as the case may be.

  4. In rural areas will be informed the name or road number and number of the kilometer and / or name of the farm where the property is located.
  5. Telephone.
  6. Number of people in the family nucleus.

4. Presentation of the suitable document that accredits that the applicant is in legal possession of the property. Any of the following documents are accepted:

  1. Deed of ownership or title of ownership of the dwelling.
  2. Free permanent usufruct certificate.
  3. Certificate of habitable issued by the relevant Directorate of Housing..
  4. Construction License for new homes with temporary facilities built, except for breakdowns or existing homes.
  5. Exchange resolution.
  6. Contract with the owner of the property granting the use usufruct to the applicant of the service.
  7. Authorization for the construction or occupation of a home issued by the competent agency in that area: ANAP, Poder Popular, Cooperativa and Hidroenergía.

5. Demand that the liquidation of the place of origin be presented in case of being discharged by transfer.

6. Magnitude of the load to be connected, detailing the number and capacity of lights and other electrical equipment to be used, as well as their operating voltage..

For further information you can consult the document: UC-CC 0001 Contracting services in the residential sector.

Add comment

When making your comment keep in mind that:
- You should not use obscene or offensive words.
- Comments should be related to the topic.
- Comments that violate previous policies will not be posted.


Did you find useful the information published on this portal?